New Youtube channel for Plus38 Condo!! See the latest lifestyle video of Plus 38 Condo -- Would you be part of this community? Do you like the air you breath?   Follow us on www.youtube.com/plus38condo

We welcome comments from Owners, Buyers, Sellers, Renters of Plus 38 - We all can make and effort to make Plus 38 Great Again!

Comment from Owner Plus 38:

Patchrawut Vajarodaya ---   There are certain things that I think the building management can improve.


- Ventilation system : All the smells from lower floors cannot vent fast enough. Causing odor to stuck in the upper floors


- Lobby could improve. Now it looks more like a low end office. Not a good first impression. (Take a look at Plus 49 Condo in Soi 49 which was built almost the same specification as Plus 38)


- Why do we have to hire two maintenance guys. We can have one at a time. Also, we are quite a small building with one small hall way on each floor. I think two cleaning ladies would suffice instead of three.


- If lighting to be replaced with LED. I would recommend using Siemens or Kyocera LED. The ballasts are much more robust than Chinese made brands or LiKese and light dispersion angle is much wider. They are twice as expensive but it will last a decade. I also do not recommend using 220V LED on the roof (swimming pool floor), as it attracts lightning. 12V LED to light up the swimming pool is fine. Or if you want to be super safe then Siemens has 12V OLED for swimming pools which can change color as well.

Gardeners are hired, but leave Garden UNKEPT & UGLY

23mar19poolgardenhose.jpg
6apr19 poolbushes__4362.jpg
facebook blog1.PNG
fb3.PNG
Fb2.PNG

Two Years Peeling Pool Deck - Shameful

60673.jpg
Join My Mailing List
5mar19j.jpg

Plus 38 Condo website by Owners who care and want to

improve the living and lifestyle at our condominium :)

 

© 2023 by Going Places. Proudly created with Wix.com

  • White Facebook Icon

       Pool Deck - Conspiracy Theory Plus 38

A committee member said contractor wrote in contract that Primer would be used for the pressurised wood.  It was not used.  And immediately paint started to peel.  Building management should have contacted contractor to properly complete job. (Sinful that Building Management did not inspect work to see if Primer was used).  Upon repainted, Primer was still not used.  Again paint peeled off.  Again Khun Supannee did not inspect or quality control contractor work.  Then Committee said it was a weather issue from the rain.  Denying anything to do with the Primer.  Then Khun Wilai, CEO We Wise Management, said she would personally guarantee proper painting with primer in January 2018.  As you can see nothing has been done.  Committee does not care, Managment does not care and unfortunately, few if any owners go to the deck or care.